Extract/Order Form

Download:
Initiates file downloadExtract
 446 KB

Download:
Initiates file downloadOrder Form
 21 KB

Add-ons

Download:
Initiates file downloadMonitor
47 KB

Download:
Initiates file downloadProject Tracker
37 KB

Link:
Opens internal link in current windowArchive



Press

Download:
Initiates file downloadPress Release
22 KB
 

You are here: | Publications | Waste Industry | Waste to Energy

ecoprog / Fraunhofer UMSICHT

Waste to Energy 2011/2012 – The World Market for Waste Incineration Plants

The energetic use of waste continues to grow throughout the world – global incineration capacities increased by three per cent per year from 2005 to 2010. In the next five years, this growth will increase to six per cent per year. The worldwide incineration capacities by 2015 will be twice as high as those ten years before.

This boom is caused by the international population increase, urban growth and an increasingly tightened environmental legislation. Areas for the landfilling of municipal waste run short, thermal waste recovery becomes more attractive.

Again, industry insiders in the most important worldwide markets – like Eastern Europe, North America, Japan or South Korea – contributed to the latest edition of the worldwide largest data collection on waste incineration.

The market study “Waste to Energy 2011/2012” includes:

  • A detailed analysis of pros and cons, technology and costs of waste incineration, including all the important political, economic, managerial and technical trends.
  • A concrete description of the current and future market volumes by countries, up to and including 2015, based on a transparent and comprehensible methodology.
  • A project list with new construction, extension and renewal projects, of which more than 125 are under construction, almost 58 have been approved and over 220 are being planned.
  • A presentation of around 1,000 incineration plants worldwide, including essential technical data and contact addresses. This also includes the description of more than 2,200 incineration lines with information on capacities, manufacturers and commissionings.
  • An analysis and description of the world’s most important operators and plant manufacturers, including market shares.


In addition to the study, every client gets access to the following add-ons for one year:

  • ecoprog WtE Monitor: Update on current construction and modernization projects worldwide. The dispatch takes place every 14 days.
  • ecoprog WtE Project Tracker: Complete list of all known projects worldwide, including status, capacity and commissioning.
  • ecoprog WtE Archive: Access to all monitor messages since the first edition in November 2009.


The study is available in German and English starting from 3,900,- euros plus VAT. Subscription rates on request.

Contact:

Jana Stienen
ecoprog GmbH
Tel. +49 221 788 03 88-12
Fax +49 221 788 03 88-10
Opens window for sending emailj.stienen(at)ecoprog.com

 
Seite aktualisiert: 20.04.2012